V3_v3_wrksh_logo

Trotter Road is an important segment of the City’s Community Street Network and a north-south segment within the City's Southwest Urban Trail Corridor. The Trotter Road Community Street Improvements project is programmed for construction in FY 2017 and will provide improvements to the roadway and drainage facilities within the Trotter Road Right-of-way from 8th Avenue SW to Hillsdale Avenue. At the August 23, 2016 City Commission Work Session staff will provide the City Commission with an overview of the feedback from the Open House being held immediately prior to the meeting and public comment will be accepted. The City would like to hear your feedback and ideas for the Trotter Road project. Below are exhibits detailing each part of the project. We appreciate your input!

Read more about the Trotter Road Project

Small2_multimodal

The Trotter Road project will accomodate growth by promoting use of transit and addressing deficient bicycle and pedestrian accomodations along the community street corridor. This exhibit identifes key location points of bus stops and bus routes, neighborhood hub, traffic calming tools, and gateway feature locations. Different sections of the road are presented in the inset graphics. Trotter Road Reconstruction will include landscape median at select locations, 11 foot travel lanes, with 4-foot bike lanes, and 5-foot sidewalk on each side of the road.  Rain Gardens represent landscape islands with maximum 6" depression for infiltration purposes where as Bioswales represent 12" deep catchment basins with control structures and discharge of excess flow.

View Exhibit PDF

0 Responses

Before you respond to this topic please: Sign In or Sign Up